Professional sample collection and accredited laboratory analysis for asbestos-containing materials and lead-based paint. Required by Washington State law before renovation or demolition of pre-1985 buildings. Fast turnaround, detailed reporting, and clear next steps.
KNOW BEFORE YOU DISTURB
Washington State requires that any building constructed before 1985 be surveyed for asbestos-containing materials (ACM) before any renovation or demolition work begins. Similarly, homes built before 1978 must be tested for lead-based paint before work that could create lead dust or debris.
These aren't just regulations — they're protections. Disturbing asbestos or lead without proper identification puts workers, occupants, and entire buildings at risk. Fines for non-compliance can reach tens of thousands of dollars, and the health consequences are severe and permanent.
Global Asbestos Abatement provides fast, professional testing so you know exactly what you're dealing with before the first hammer swings.
⚠️ Asbestos Testing
Our certified inspectors collect bulk samples of suspect materials — ceiling texture, floor tile, pipe insulation, roofing, siding, joint compound, and more. Samples are sent to an accredited laboratory for polarized light microscopy (PLM) analysis.
Results typically come back within 3-5 business days, with rush turnaround available for time-sensitive projects. You receive a detailed report identifying which materials contain asbestos, the type and percentage of fibers, and recommendations for abatement or management.
- Bulk sample collection per EPA/AHERA protocols
- PLM and TEM laboratory analysis
- Detailed survey report with material locations mapped
- Abatement recommendations and cost guidance
- Rush results available (24-48 hours)
🔬 Lead Paint Testing
Lead-based paint was commonly used in homes and buildings constructed before 1978. Our testing identifies the presence and concentration of lead in painted surfaces throughout your property using paint chip collection and XRF analysis methods.
Testing is critical before any renovation that involves sanding, scraping, cutting, or demolishing painted surfaces in pre-1978 buildings. The EPA's Renovation, Repair, and Painting (RRP) Rule requires lead testing or the assumption of lead presence for all work in these structures.
- Paint chip sampling and XRF (X-ray fluorescence) analysis
- Room-by-room identification of lead-painted surfaces
- Concentration levels and risk assessment
- RRP Rule compliance documentation
- Guidance on lead-safe renovation practices
Testing isn't optional in many situations. Here's when Washington State law or best practices require professional hazardous material surveys.
Before Renovation
Any renovation that disturbs building materials in a pre-1985 structure requires an asbestos survey. Lead testing is required in pre-1978 buildings.
Before Demolition
Washington State requires a complete asbestos survey with 10 working days' notice to L&I before any demolition of a pre-1985 building.
Real Estate Transactions
Home inspections may flag suspect materials. Testing provides definitive answers for buyers, sellers, and lenders before closing.
Commercial Tenant Improvements
Landlords and tenants must verify the absence of ACM before any buildout, remodel, or improvement work in older commercial spaces.
Schools & Public Buildings
AHERA requires that all schools maintain an asbestos management plan with periodic re-inspections and testing every three years.
Property Management
Ongoing building maintenance in pre-1985 properties should include an asbestos management plan and periodic condition assessments.
OUR TESTING PROCESS
1. Schedule an Inspection
Contact us with your project details — building age, type of work planned, and timeline. We'll schedule an on-site inspection at a time that works for your project.
2. Sample Collection
Our certified inspectors collect bulk samples of suspect materials throughout the building. Each sample is documented with location, material type, condition, and photos.
3. Laboratory Analysis
Samples are sent to an accredited lab for analysis. Standard turnaround is 3-5 business days. Rush results available for projects that can't wait.
4. Report & Recommendations
You receive a detailed survey report with test results, a map of material locations, and clear recommendations for next steps — whether that's abatement, encapsulation, or a management plan.